SMU MBA ASSIGNMENTS

Sikkim manipal Solved MBA Assignments, SMU MBA, Solved assignments, 1st sem, 2nd sem, 3rd sem, 4th sem, SMU MBA PROJECTS

Email Us

SEM 4 – OM 0015 – MAINTENANCE MANAGEMENT WINTER 2014

SMU MBA WINTER 2014-2015 solved Assignments are available

 

Dear Students,

 

SMU MBA WINTER 2014 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your “ Email ID ” us in the following Format “ On +91 9995105420 we will reach back you with in 24H ”

 

 

 

 DRIVE WINTER 2014
PROGRAM MBADS (SEM 4/SEM 6)

MBAFLEX/ MBA (SEM 4)

PGDOMN (SEM 2)

SUBJECT CODE & NAME OM 0015 – MAINTENANCE MANAGEMENT
BK ID B2008
CREDIT 4
MARKS 60

 

1

Write short notes on :

Need for maintenance management

Maintenance resources

Decentralized maintenance

Reliability Centered Maintenance

A

Need for maintenance management

Maintenance resources

Decentralized maintenance

Reliability Centered Maintenance

 

2

Optimizing Maintenance at XYZ Electricals

XYZ Electricals is one of the leading manufacturers of electrical utilities. The organisation is well known for delivering quality products to consumers. It has adopted

A preventive maintenance (PM) approach for the maintenance of its machines and equipment. However, in the last few months, the organisation has observed an increase in:

  • Maintenance costs
  • Facility downtime
  • Frequent failures of components

After thorough analysis, it has been found that the main cause behind all the problems is the excessive use of preventive maintenance. The organisation also realized that it must adopt a maintenance process that maintains a balance between the requirements and resources of maintenance.

Therefore, XYZ decided to implement maintenance optimization procedures in the plant. Various optimization techniques were developed to convert traditional preventive maintenance into a cost – effective program. These techniques aimed at:

  • Identifying assets that affect plant operations
  • Identifying assets that may benefit most from preventive maintenance
  • Selecting the most appropriate preventive tasks
  • Combining appropriate traditional maintenance tasks with predictive maintenance tasks
  • Implementing appropriate training methods to apply optimization techniques

After implementing maintenance optimisation techniques, the benefits that XYZ received after optimising its maintenance are:

  • Reduction in maintenance costs by removing unnecessary corrective maintenance expenses
  • Improvement in understanding of assets
  • Application of cost – effective preventive maintenance techniques
  • Better assessment of functioning of assets when they are in operation

What are the problems at XYZ Electricals? Which was adopted to overcome the problems? Assess if the solution is effective in resolving the problem.

A

List the problems at XYZ

Describe the reason behind the problems

Discuss the solution adopted to overcome the problem

List the benefits of the solution

Argue/conclude if the solution is effective

 

 

3

Write short notes on:

  • Production philosophy
  • Mean Time to Repair
  • Maintenance documentation
  • Online or permanent condition monitoring

A

  • Production philosophy
  • Mean Time to Repair
  • Maintenance documentation
  • Online or permanent condition monitoring

 

4

Which are the common tasks performed in maintenance management?

A

List the common tasks in preventive maintenance

Discuss the common tasks in preventive maintenance

Give example for each common tasks in preventive maintenance

 

5

What are the benefits and issues related to predictive maintenance?

A

List the benefits

Discuss the benefits

List the issues

Discuss the issues

 

6

Write short notes on

  • Structure of maintenance budget
  • Role of maintenance auditor
  • Codification of spare parts
  • Types of maintenance benchmarking

A

  • Structure of maintenance budget
  • Role of maintenance auditor
  • Codification of spare parts
  • Types of maintenance benchmarking

 

 

 

SMU MBA WINTER 2014-2015 solved Assignments are available

 

Dear Students,

 

SMU MBA WINTER 2014 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your “ Email ID ” us in the following Format “ On +91 9995105420 we will reach back you with in 24H ”

 

Leave a Reply

You must be logged in to post a comment.