SMU MBA ASSIGNMENTS

Sikkim manipal Solved MBA Assignments, SMU MBA, Solved assignments, 1st sem, 2nd sem, 3rd sem, 4th sem, SMU MBA PROJECTS

Email Us

SEM 4 – OM0017 – ADVANCED PRODUCTION PLANNING AND CONTROL SMU MBA WINTER 2015 -2016

SMU MBA WINTER 2015 -2016

Dear Students,

SMU MBA WINTER 2015-2016 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420  or S M S your “ Email ID ” us in the following Format  “  On +91 9995105420 we will reach back you with in 24H ”

DRIVE WINTER 2015
PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBA (SEM 4)
SUBJECT CODE & NAME OM0017 – ADVANCED PRODUCTION PLANNING AND CONTROL (4 CREDITS)
BK ID B2010
MARKS 60

Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.

Q.No Criteria Marks Total Marks
1 Explain the flow of information in a production process.
A Describe why information flow is critical in production planning with a help of an example

 

Describe the flow of information in a production process

 

List the factors that need to considered in a flow of information in  a production process

2

 

 

4

 

 

4

10
2 What are the various techniques of costing?
A List the various techniques of costing Explain the 6 techniques of costing 1

9(1.5 marks each)

10
3 Explain any TEN features of the Advanced Planning and Scheduling (APS) system.
A List and describe any TEN features of the Advanced Planning and Scheduling (APS) system 10 (1 mark X 10 features) 10
4 What are the rules for scheduling Kanban production?
A List rules for scheduling Kanban production Explain the 6 rules for scheduling Kanban production 1

9 (1.5 marks each)

10
5 What are factors must be considered while implementing a production planning and control system?
A Explain the 4 factors to be considered while implementing a production planning and control system 10 (2.5 marks each) 10
6 Mention the reasons why manufacturing organizations choose Excel and Visual Basic prototype as planning and scheduling tools.
A List the 8 reasons why manufacturing organizations choose Excel and Visual Basic prototype as planning and scheduling tools 10 (1.25 marks each) 10

 

*A-Answer

 

SMU MBA WINTER 2015 -2016

Dear Students,

SMU MBA WINTER 2015-2016 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420  or S M S your “ Email ID ” us in the following Format  “  On +91 9995105420 we will reach back you with in 24H ”

 

 

Comments are closed.