SMU MBA ASSIGNMENTS

Sikkim manipal Solved MBA Assignments, SMU MBA, Solved assignments, 1st sem, 2nd sem, 3rd sem, 4th sem, SMU MBA PROJECTS

Email Us

SMU MBA SEM 4 – PM 0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT

SMU MBA WINTER 2015 -2016

Dear Students,

SMU MBA WINTER 2015-2016 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420  or S M S your “ Email ID ” us in the following Format  “  On +91 9995105420 we will reach back you with in 24H ”

 

DRIVE- Winter 2015

PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBA (SEM 4)

PGDPMN (SEM 2)

SUBJECT CODE & NAME- PM 0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT

Qus:1 Write short notes on:

  • Kano model
  • Differences between a sponsor’s view and project’s view in a project balance sheet
  • Triangular distribution
  • Organisational break down structure

Answer:

Kano model:

In comparison to the previous two models, the Kano model is narrow in its approach. Its primary focus is on the customer

 

 

Qus:2 Discuss capital budgeting in project management.

  • Describe use of capital budgeting to an organisation in terms of undertaking multiple projects
  • Explain the importance of capital budgeting in project selection
  • Discuss the aspects of capital budgeting that an organisation should consider while selecting a project.

Answer:

Describe use of capital budgeting to an organisation in terms of undertaking multiple projects:

An organisation undertakes multiple projects with different capital requirements and rates of returns. For instance, some projects may need investment over a longer period of time, whereas others need investments

 

 

Qus:3 Write short notes on:

  • Rolling wave planning
  • Time centric earned value

Answer:

Rolling wave planning:

Rolling wave planning is an iterative planning in which work to be accomplished in the near term is planned in

 

Qus:4 Describe the various cost incurred in a project. Describe the applications of three – point estimates.

  • Discuss the THREE types of costs incurred in a project
  • Discuss the applications of three – point estimates.

Answer:

Discuss the THREE types of costs incurred in a project:

The THREE types of costs incurred in

 

 

Qus:5 Explain the six sigma methodologies.

  • Discuss the 2 six sigma project methodologies
  • Compare the 2 six sigma project methodologies

Answer:

Discuss the 2 six sigma project methodologies:

TheDMAIC project methodology has the following five phases:

 

  • Define: It includes defining and analysing the problem and understanding the voice of the customer,

 

 

Qus:6 Discuss the time and materials contract.

Solve the following problem

Consider a time and materials contract as follows:

Labour is billed according to the following schedule

1 software engineer: $45/hr

1 tester: $ 45/hr

1 senior software engineer: $65/hr

Material is billed according to the following schedule:

Cost of materials + 30 % profit/overhead

Actual cost of the material is $2140

Calculate the material cost, calculate the contract payable

  • Describe the time and materials contract
  • Calculation of material cost
  • Calculation of contract payable

Answer:

 

Describe the time and materials contract:

The time and materials contract is a cross between FP and CP contracts. It is opposed to FP contracts in which the buyer agrees to pay the contractor a lump sum for performance regardless of what the contractors pay their employees, sub-contractors, and suppliers. This is the most risk-free type of contract. In this type of contract, the time and material used for the project are priced. Thus, the contractor only requires to know the time and

 