SMU MBA ASSIGNMENTS

Sikkim manipal Solved MBA Assignments, SMU MBA, Solved assignments, 1st sem, 2nd sem, 3rd sem, 4th sem, SMU MBA PROJECTS

Email Us

SEM 4 – PM 0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT WINTER 2014

SMU MBA WINTER 2014-2015 solved Assignments are available

 

Dear Students,

 

SMU MBA WINTER 2014 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your “ Email ID ” us in the following Format “ On +91 9995105420 we will reach back you with in 24H ”

 

 

 DRIVE WINTER 2014
PROGRAM MBADS (SEM 4/SEM 6)

MBAFLEX/ MBA (SEM 4)

PGDPMN (SEM 2)

SUBJECT CODE & NAME PM 0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT
BK ID B2011
CREDIT AND MARKS 4 CREDITS AND 60 MARKS

 

1

Write short notes on:

  • Kano model
  • Differences between a sponsor’s view and project’s view in a project balance sheet
  • Triangular distribution
  • Organisational break down structure

A

  • Kano model
  • Differences between a sponsor’s view and project’s view in a project balance sheet
  • Triangular distribution
  • Organisational break down structure

 

 

2

Discuss capital budgeting in project management.

A

describe use of capital budgeting to an organisation in terms of undertaking multiple projects

Explain the importance of capital budgeting in project selection

Discuss the aspects of capital budgeting that an organisation should consider while selecting a project.

3

Write short notes on:

  • Rolling wave planning
  • Time centric earned value

A

  • Rolling wave planning
  • Time centric earned value

 

 

4

Describe the various cost incurred in a project. Describe the applications of three – point estimates.

A

Discuss the THREE types of costs incurred in a project

Discuss the applications of three – point estimates.

 

 

5

Explain the six sigma methodologies.

A

Discuss the 2 six sigma project methodologies

Compare the 2 six sigma project methodologies

 

 

6 Discuss the time and materials contract.

 Solve the following problem

Consider a the time and materials contract as follows:

Labour is billed according to the following schedule

1 software engineer : $45/hr

1 tester: $ 45/hr

1 senior software engineer: $65/hr

Material is billed according to the following schedule:

Cost of materials + 30 % profit/overhead

Actual cost of the material is $2140

Calculate the material cost, calculate the contract payable

A

Describe the time and materials contract

Calculation of material cost

Calculation of contract payable

 

 

SMU MBA WINTER 2014-2015 solved Assignments are available

 

Dear Students,

 

SMU MBA WINTER 2014 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your “ Email ID ” us in the following Format “ On +91 9995105420 we will reach back you with in 24H ”

 

Leave a Reply

You must be logged in to post a comment.