SMU MBA ASSIGNMENTS

Sikkim manipal Solved MBA Assignments, SMU MBA, Solved assignments, 1st sem, 2nd sem, 3rd sem, 4th sem, SMU MBA PROJECTS

Email Us

Prepare a Project Initiation Kick Off Plan for a residential flat scheme (5 storey, 30 apartments, 3 BHK)/or a 1000 seated indoor stadium. Establish the objectives and scope of the project; it is first necessary to identify the overall reason for the project by relating it to one or more objectives of the organization.

July 02, 2013 By: Meliza Category: 1st SEM

Management information Systems (MIS) is the discipline covering the application of people, technologies, and procedures – collectively called information systems – to solving business problems.

Management Information Systems are distinct from regular information systems in that they are used to analyze other information systems applied in operational activities in the organization. Academically, the term is commonly used to refer to the group of information management methods tied to the automation or support of human decision making. There are many elements to Management Information Systems (MIS) which include:

  • Data – The data input to the system must be as accurate as it can be, subject to its costs and timescales for capture. It should then be stored in the most logical way. This often differs from how the data is input. The data then needs to be summarized to create information in a way that best meets the needs of the systems users – this may not necessarily be the most logical way or the easiest or cheapest for the IT team.

For getting complete Answer , Kindly write to our email ID : kvsude@gmail.com or Reach us on +91 9995105420

Leave a Reply

You must be logged in to post a comment.