3 Write short notes on: 1. 5Ss system of waste elimination 2. Scheduling in services 3. Vendor managed inventory 4. Subcontracting capacity (production) option

February 27, 2015 By: Meliza Category: 1st SEM

Answer:-

  1. 5 Ss system of waste elimination

The 5Ss are as follows:

  • Sort/segregate – Keep what is needed and remove everything else from the work area; when in doubt, throw it out. Identify non-value items and remove them. Getting rid of these items makes space available and usually improves the work flow.
  • Simplify/straighten – Arrange and use analysis tools to improve the work flow and reduce wasted motion. Consider long-run and short-run ergonomic issues. Label and display for easy use only what is needed in the immediate work area.